Hardware and software platforms
Planning
·
The planning phase entails the
determination of the objective of the system and requirements for producing the
product (Morris & Media, 2015).
·
It will entail the determination of the
resources required to set up the Internet in the new home including costs and
personnel. There is also the preparation of the concept of the new Internet
connection.
·
There is also in this phase the
consideration of the various alternatives to creating ten new projects. In case
there is no viable alternative then there will be the assembling of the
information into a project plan.
·
The alternatives for consideration in
this particular project are the different Internet service providers.
·
There will also be ten carrying out of
the feasibility study to determine if the project will be feasible in light of
the resources available (Radack, 2009).
Analysis
·
It is the phase that entails a
determination of the end-user requirements.
·
It involves gathering factual; data,
comprehending processes involved, identifying problems and then making a
recommendation for feasible suggestions for system functionality.
·
It takes place with the help of the
client focus groups that offer an explanation of their needs and expectations
from the new system for the new system and how it will perform.
·
“The major objectives that this phase
will accommodate include, giving answers to the following questions. What is
taking place? How is it taking place? Who are doing it? When are they doing it?
Why are they doing it? How can it have improvement?” (Radack, 2009).
·
The requirements of the user of the
Internet connection swill have documentation and get a sign-off from the user
and management to move forward with the design of the system.
Design
·
In the design phase, there is the
translation of the logical system design into and architectural view of the
system (Kay, 2002).
·
It entails drawing interconnections of
the Internet in all the rooms of the new houses, where cables will be in
placement and how data will be flowing between various devices.
·
It is the most crucial phase of system
development life cycle. It is where the
system development process continues to move from the 'what' questions of the
analysis phase to 'how'.
·
There will be turning the logical design
of the Internet connection into a physical design. That is normally a detailed
description of the requirements for solving the original problem.
·
There will be a decision of the hardwareand software platforms in which the new Internet connection will run.
·
There will also be tools and techniques
description including data flow diagram, structured English, and data
dictionary decision tree and decision table.
Construction
§ The
construction phase of the system development life cycle is where there will be
executing of the laid down plans for the design phase.
§ In
this phase, there will be configuration and enablement of the new Internet
connection features, and installation of the system (Kay, 2002).
§ There
will also be testing of the components during the system construction before
the actual testing takes place. All the
components such as cables, network devices and other peripheral devices and
software should work correctly.
§ The
new Internet connection should meet the required security specifications before
it comes into operation. There should
also be the inclusion of additional controls to support the system and then
testing of those controls to ensure they do not invalidate or conflict with the
existing controls.
Testing
§ During
the testing phase of SDLC, there is testing of the system for functionality and
performance (NIOS, 2015).
§ The
setup network should undergo testing top ensure all the components and
interconnections are working as desired and there is no problem accessing Web.
§ The
intercommunications between the various devices must work correctly and should
be compatible with software in the entire system.
§ The
core element of this phase is to verify that the new Internet connection
contains all the end-user requirements outlined in the analysis phase. It is
also to determine if all the functions are accurately processing data, and that
the new system meets all the quality standards.
§ When
there is proof that the Internet connection if running properly, the working
should have a demonstration for the house owner to see if it is meeting his
requirements.
§ The
rollout phase is when the then system comes to live, and the owner begins to
work with the new Internet connection.
§ When
the rollout begins, there is also the beginning to receiving the feedback from
the house owner and other users. There can then be a resolution of any
performance issues that may arise or the mishandling of data and components.
§ During
this system, there will be loading of system programs into the user’s computer,
and then the user will undergo training to understand how to work with the
system.
§ The
major training topics will entail how to execute the package, enter data,
process data, and how to take out reports.
References
Kay,
R. (2002). System development life cycle.
Morris,
K. & Media, D. (2015). Steps in the system development life cycle.
NIOS
(2015). Phases of system development life cycle.
Radack,
S. (2009). The system development life cycle (SDLC).